Soho, facade retention and demolition of a 140,000 sq. ft hotel in a conservation area. The site is situated in central London with a range of constraints e.g. the Piccadilly line tunnel, tight single lane one-way streets and TFL cycles. The site is also boarded by a number of properties demanding agreement of over 50 Party Wall Awards. The development will be a 4-star hotel, providing 194 keys, outdoor dining in a covered courtyard and retail facilities at ground and basement levels.

The procurement route was two stages i.e. stage 1 – demolition, substructure and frame, and stage 2 fit out. Both stages were based on a design and build contract.

Our representative was the project manager responsible for supporting the Client and managing a high calibre design team. The project was managed from RIBA works stage 1 to RIBA works stage 3.5. The planning application was sensitive, and we managed the submission of three applications and the associated changes.

Talk to an expert

Alternatively use the form below and we will call you back.
Tell us a little about the project so we can have the best person call you.